BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Clean Water for North Carolina - ECPv6.16.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Clean Water for North Carolina
X-ORIGINAL-URL:https://cwfnc.org
X-WR-CALDESC:Events for Clean Water for North Carolina
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20210314T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20211107T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20220313T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20221106T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20230312T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20231105T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20220328T080000
DTEND;TZID=America/New_York:20220502T235900
DTSTAMP:20260527T114523
CREATED:20220328T222919Z
LAST-MODIFIED:20220328T222919Z
UID:7631-1648454400-1651535940@cwfnc.org
SUMMARY:State Accepting Public Comments on Draft Permit to address Chemours Groundwater Contamination
DESCRIPTION:State Accepting Public Comments on Draft Permit to address Chemours Groundwater Contamination \nPermit is part of remediation plan to prevent PFAS discharge to the Cape Fear River \nThe North Carolina Department of Environmental Quality Division of Water Resources (DWR) is accepting public comments on a draft permit to treat PFAS-contaminated groundwater\, surface water and stormwater from the Chemours Fayetteville Works site before discharge into the Cape Fear River. The National Pollutant Discharge Elimination System (NPDES) wastewater permit is part of the required actions to prevent residual PFAS pollution from entering the Cape Fear River\, as outlined in the 2020 Addendum to the 2019 Consent Order. \nThe draft NPDES permit only allows the discharge of treated water associated with the remediation activities. It does not allow the discharge of wastewater from plant operations or processes. \nUnder the 2020 Addendum\, Chemours was required to address four identified seeps that account for more than half of the PFAS contamination in the groundwater entering the river. The required interim measures have been installed and Chemours has submitted plans to DEQ for approval of the permanent measure: a more than one-mile-long\, subsurface barrier wall and groundwater extraction system to capture contaminated groundwater and prevent it from entering the Cape Fear River. The draft NPDES permit requires treatment to remove PFAS contamination from the groundwater\, surface water and stormwater captured by the extraction system before discharge into the Cape Fear River. The system must remove at least 99% of PFAS and meet daily and monthly effluent limits as specified in the permit conditions. \nThe proposed NPDES permit does not change the conditions of any previous NPDES permit held by Chemours. \nDWR is accepting comments on the draft permit until May 2\, 2022. To submit comment by email\, send to publiccomments@ncdenr.gov with CHEMOURS noted in the subject line. Public comments may also be mailed to Wastewater Permitting\, Attn: Chemours Permit\, 1617 Mail Service Center\, Raleigh\, N.C.\, 27699-1617. \nThe draft permit and fact sheet are available to view online.
URL:https://cwfnc.org/calendar/state-accepting-public-comments-on-draft-permit-to-address-chemours-groundwater-contamination/
CATEGORIES:Action Item,Comment Deadline
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20220414T090000
DTEND;TZID=America/New_York:20220414T123000
DTSTAMP:20260527T114523
CREATED:20220412T173414Z
LAST-MODIFIED:20220412T183632Z
UID:7824-1649926800-1649939400@cwfnc.org
SUMMARY:State Water Infrastructure Authority to meet in Asheboro and via WebEx\, April 14
DESCRIPTION:The State Water Infrastructure Authority will meet in Asheboro on Wednesday\, April 13 and Thursday\, April 14. The public may listen to the meeting online or by phone. \nWHO:   State Water Infrastructure AuthorityWHAT: Meeting\nWHEN: Wednesday\, April 13 (2:00 – 5:00 p.m.) and Thursday\, April 14 (9:00 a.m. – 12:30 p.m.)\nWHERE: North Carolina Zoo\, 4401 Zoo Parkway\, Asheboro and virtually (WebEx).\nAGENDA: April 13 – April 14 State Water Infrastructure Authority Meeting Agenda \nInstructions for listening to the meeting (each meeting day has specific WebEx instructions): \nFor Wednesday\, April 13 \nOnline: https://ncdenrits.webex.com/ncdenrits/onstage/g.php?MTID=eee97c5a588927a6c756bb3cc6148a44c\nEvent Password: NCDWI\nBy Phone: 415-655-0003\nAccess Code:  2434 246 3984 \nFor Thursday\, April 14 \nOnline: https://ncdenrits.webex.com/ncdenrits/onstage/g.php?MTID=ee3c0af5bd9fe4a64ebbcc2c80348ff7b\nEvent Password: NCDWI\nBy Phone: 415-655-0003\nAccess Code: 2426 590 2279 \nThe authority is an independent body with primary responsibility for awarding federal and state funding for water and wastewater infrastructure projects. Other responsibilities include developing a state water infrastructure master plan\, recommending ways to maximize the use of available loan and grant funding resources\, and examining best and emerging practices. \nTo learn more about the State Water Infrastructure Authority: https://deq.nc.gov/about/divisions/water-infrastructure/state-water-infrastructure-authority
URL:https://cwfnc.org/calendar/state-water-infrastructure-authority-to-meet-in-asheboro-and-via-webex-april-14/
CATEGORIES:Public Meeting
END:VEVENT
END:VCALENDAR