BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Clean Water for North Carolina - ECPv6.16.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Clean Water for North Carolina
X-ORIGINAL-URL:https://cwfnc.org
X-WR-CALDESC:Events for Clean Water for North Carolina
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20210314T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20211107T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20220313T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20221106T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20230312T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20231105T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20220621T180000
DTEND;TZID=America/New_York:20220621T200000
DTSTAMP:20260527T094857
CREATED:20220523T175311Z
LAST-MODIFIED:20220523T175311Z
UID:8020-1655834400-1655841600@cwfnc.org
SUMMARY:In-Person Hearing for Chemours Draft Permit to Address Groundwater Contamination
DESCRIPTION:Date: Tuesday\, June 21\, 2022\, at 6 p.m.\nLocation: Cape Fear Community College\, 411 N. Front Street\, Wilmington\nUnion Station\, First Floor Auditorium\nRegister: Speaker registration opens at 5 p.m.\, onsite signup sheet \nThe North Carolina Department of Environmental Quality Division of Water Resources (DWR) will hold public hearings on June 21 and 23 to accept comments on the draft discharge permit for a proposed groundwater treatment system at the Chemours Fayetteville Works facility that would substantially reduce the PFAS entering the Cape Fear River via contaminated groundwater. Chemours is required to remove at least 99% of PFAS from the contaminated groundwater before discharge. Currently\, contaminated groundwater flowing into the river is not intercepted or treated. \nDWR will continue to accept comments on the proposed National Pollutant Discharge Elimination System (NPDES) wastewater permit through 5 p.m.\, June 24. Comments submitted during the previous comment period from March 25 to May 2\, 2022 are being considered and do not need to be resubmitted. \nTo give interested communities opportunities to comment\, two public hearings are scheduled for this draft permit\, one in-person\, and one held remotely. \nTo submit comments by email\, send to publiccomments@ncdenr.gov with CHEMOURS noted in the subject line. Public comments may also be mailed to Wastewater Permitting\, Attn: Chemours Permit\, 1617 Mail Service Center\, Raleigh\, N.C.\, 27699-1617. \nThe draft permit and fact sheet are available to view online. \nChemours has been prohibited from discharging PFAS-contaminated process wastewater from its manufacturing operations into the Cape Fear River since 2017. However\, historic operations at the facility have caused significant groundwater contamination at the site. The draft NPDES permit (NC0090042) allows only the discharge of treated water associated with groundwater remediation efforts\, primarily treated groundwater\, some surface water and stormwater. It would not allow the discharge of wastewater from Chemours manufacturing processes. \nAs outlined in the 2020 Addendum to the Consent Order\, Chemours is required to address groundwater contamination by installing an underground barrier wall that will run more than a mile alongside the Cape Fear River. This wall will intercept contaminated groundwater from the facility before it reaches the river\, and a series of extraction wells will pump the captured groundwater to a treatment system. The draft permit requires that the treatment system remove at least 99% of PFAS from the pumped groundwater before it enters the river. Without this treatment system intervention and accompanying discharge permit\, this heavily contaminated groundwater would continue to flow to the river untreated and continue to impact downstream water supplies.
URL:https://cwfnc.org/calendar/in-person-hearing-for-chemours-draft-permit-to-address-groundwater-contamination/
CATEGORIES:Comment Deadline,Hearing
END:VEVENT
END:VCALENDAR